Lowestoft’s bascule bridge to be closed for maintenance work

ESSENTIAL maintenance work on Lowestoft's bascule bridge over Lake Lothing will continue from this weekend and lead to it being closed.

The bridge will be closed overnight on Sunday between 8pm and 6am while a fault on one of its hydraulic units on the south bridge is investigated further.

Overnight repairs will then take place from Sunday, November 13 to Wednesday, November 16 between 8pm and 6am.

The hydraulic units are part of the system which lifts the bridge to allow harbour traffic to pass underneath.

Repairs to a faulty hydraulic unit on the north side of the bridge were completed in June.


You may also want to watch:


However, further checks of the other hydraulic units have revealed that there may be a similar fault in one of the units that lift the south part of the bridge and repairs are needed to ensure the bridge remains serviceable.

A free bus service around the diversion route will be provided for pedestrians wishing to cross the bridge during the closures.

Most Read

Advanced signing and a signed diversion route will be in place during the works. All restrictions will be removed outside working times.

Become a Supporter

This newspaper has been a central part of community life for many years. Our industry faces testing times, which is why we're asking for your support. Every contribution will help us continue to produce local journalism that makes a measurable difference to our community.

Become a Supporter
Comments powered by Disqus