The Broads Internal Drainage Board (BIDB) gives notice of its intention to carry out a project to 1 improve the flood defence banks alongside The Muckfleet” watercourse between Filby Broad (TG 45316 12860) and Stokesby New Road (TG 42120 11657). This project aims to reduce the risk of flooding to adjacent land and help secure the water levels in Filby Broad, which is used as a drinking water reservoir.

ANNOUNCEMENT OF INTENTION NOT TO PREPARE AN ENVIRONMENTAL STATEMENT

UNDER (REGULATION 5 OF THE ENVIRONMENTAL IMPACT ASSESSMENT (LAND DRAINAGE IMPROVEMENT WORKS) REGULATIONS 1999 AS AMENDED BY SI 2005/1399, AND SI 2006/618 AND SI 2017/585

MUCKFLEET FLOOD DEFENCE IMPROVEMENT SCHEME

The Broads Internal Drainage Board (BIDB) gives notice of its intention to carry out a project to 1 improve the flood defence banks alongside The Muckfleet” watercourse between Filby Broad (TG 45316 12860) and Stokesby New Road (TG 42120 11657).

This project aims to reduce the risk of flooding to adjacent land and help secure the water levels in Filby Broad, which is used as a drinking water reservoir. It is proposed to do this by reducing the risk of potential breach of the flood banks through minimising overtopping and improving their stability. The works will consist of the building up the crest height and back slope profile of the flood bank, and filling in the existing soke dyke. Material for this will be excavated locally in the form of a new parallel soke dyke set further into the marshes, which will be designed to encourage habitat to quickly establish along its entire length.

The BIDB considers that the improvement works are not likely to have significant effects on the environment and does not intend to prepare an environmental statement in respect of them. However, a non-statutory Environmental Action Plan (EAP) report has been produced to document the potential environmental impacts of the scheme and any associated mitigation measures. Appropriate consents and licenses will also be obtained, where necessary, relating to designated sites and protected species. An electronic copy of the EAP report is available on request from the address below, or can be viewed at the same address.

Any person wishing to make representations in relation to the likely environmental effects of the proposed improvement works should do so, in writing, to the address specified below, within 30 days of the date of publication of this notice.

Broads Internal Drainage Board Kettlewell House, Austin Fields Industrial Estate, Kings Lynn, Norfolk PE30 1PH

Date: 20 July 2018

Tel: 01553 819600

Email: info@wlma.org.uk

Become a supporter

This newspaper has been a central part of community life for many years, through good times and bad. Coronavirus is one of the greatest challenges our community has ever faced, but if we all play our part we will defeat it. We're here to serve as your advocate and trusted source of local information.

In these testing times, your support is more important than ever. Thank you.

Most Read

Comments have been disabled on this article.

Most Read

Latest from the Eastern Daily Press